SAP ERP & SAP S/4 Hana Basics • SAP Generation Shift • Product Journey to S/4 Hana • SAP Different Modules • SAP S/4 Hana • Release and Nomenclature • SAP S/4 Hana Database Basics SAP PP Process Flow & Project Methodology • Logistic End to End Process Flow • Projects with SAP S/4 HANA • Project Users and Roles • Project Methodology (ASAP vs ACTIVATE) User Interface • GUI- Graphical User Interface, • Fiori Apps • NWBC Enterprise Structure, CompanyCode and Plant Setup • Enterprise Structure • Company-Controlling Area Setup Plant Setup • FICO/MM/PP Baseline Configuration Product Costing • Basics of Product Costing • Integration between PP & CO • Product Cost estimate • Cost markup a and release PP End to End Processwith GUI • Material Master, • BOM, Work Center, Routing & PV • Product Cost Estimate • PP End to End Process Flow PP Master Data • Material Master Data • BOM- Technical Types
• PP Master Data-Work Center • PP Master Data-Routing • PP Master Data-Production Version Backflush & Auto GR • Production Order Back flush • Production Scheduling Profile • Production Order Auto Goods Receipt Demand Management Classic MRP vs MRP Live • Demand Management • MRP- Material Requirement Planning • Classic MRP vs MRP Live
Planning Strategy • MTS vs MTO • MTO Planning (20) • MTS Net Req. Planning (10) • Gross Req. Planning (11) • Planning with Final Ass. (40) • Planning with Final Ass. (59 & 50) • Planning with Final Ass (60) • Production by Lot – 30 • Planning at Ass Level- 70 • Planning at Phantom Assembly-59 • Planning w/o Final Assembly- 50 • Planning with PlanningMaterial-60 • How to Use two planning strategies for the same material Repetitive Manufacturing (REM) • Repetitive Manufacturing (REM) • Process Difference in REM & Discrete • REM Configuration • REM End-to-End Process • REM vs Discrete Mfg. Batch Management • Batch Management Configuration • Manual Batch Determination for Production Order • Automatic Batch Determination for Production Order
Sales Operation& Planning
• Standard SOP- Material
• Standard SOP- Product Group
• Flexible Planning Vs Standard SOP
• Flexible SOP
• Kanban End to End Cycle
KANBAN
• Classic Kanban
• Stock Transfer
• Externally Procurement
Capacity Planning
• Capacity Planning
• Capacity Leveling
EPS Machine EPS Cutting…
EPS Machine Eps Raw…
EPS Machine EPS Recycling…
EPS Machine EPS Mould;
EPS Machine EPS Block…
EPP Machine EPP Shape…
EPTU Machine ETPU Moulding…
EPS Machine Aging Silo…
EPTU Machine ETPU Moulding…
EPS Machine EPS and…
EPS Machine EPS and…
AEON MINING AEON MINING
AEON MINING AEON MINING
KSD Miner KSD Miner
KSD Miner KSD Miner
BCH Miner BCH Miner
BCH Miner BCH Miner
EPS Machine EPS Cutting…
EPS Machine Eps Raw…
EPS Machine EPS Recycling…
EPS Machine EPS Mould;
EPS Machine EPS Block…
EPP Machine EPP Shape…
EPTU Machine ETPU Moulding…
EPS Machine Aging Silo…
EPTU Machine ETPU Moulding…
EPS Machine EPS and…
EPS Machine EPS and…
AEON MINING AEON MINING
AEON MINING AEON MINING
KSD Miner KSD Miner
KSD Miner KSD Miner
BCH Miner BCH Miner
BCH Miner BCH Miner