Business Requirement


·      In an Inbound Process Business received a handling unit in which five different products were packed.

·      As per process flow, the first vehicle reached in warehouse premises, the system automatically determined the inbound warehouse door and unloaded the handling unit that needed to be completed at the door staging area.

·      After unloading the handling unit needs to be in the goods receipt area.

·      The received handling unit contained five products that need to be deconsolidated at the deconsolidation work center.

·      After deconsolidation at the work center each product needs to be packed on a new handling unit.

·      After completion of the packaging of each product all five products need to complete the final put-away of the product at their respective storage bin.  

·      Put-away strategy is as follows

-         Product A- Racking Reserve Storage Area

-         Product B- Racking Pick Face Storage

-         Product C- Mezzanine Ground Floor

-         Product D- Mezzanine 1st Floor

-         Product E- Mezzanine 2nd Floor

 

Required Master Data


1.     Warehouse Organizational Structure Data

 

1.1  Define Storage Type

ree
  • Define Door Storage Type- 9030 – Door Inbound

ree
ree
  • Define Goods Receipt Storage Type- 9010

ree
ree
  • Define Deconsolidation Storage Type- 8010

ree
ree
  • Define Storage Type- WAPR- Racking Reserve

ree
ree
  • Define Storage Type- WAPF- Racking Pick Facing

ree
ree
ree
  • Define Mezzanine- MEZG- (Ground Floor)

ree
ree
  • Define Mezzanine- MEZF- (1st Floor)

ree
ree
  • Define Mezzanine- MEZS- (2nd Floor)

ree
ree

1.2  Define Storage Section

ree

Step 1: Click on New Entries

ree
ree

1.3  Define Storage Bin Types

ree
ree

1.4  Define Bin Structure

ree

1.5  Define Staging Area

ree
ree

1.6   Assign Staging Area

ree
ree

1.7  Define Warehouse Door

ree
ree
ree

1.8  Assign Door Determination Group

ree
ree

1.9  Assign Staging Area to Door

ree
ree

1.10 Generate Activity Area with Storage Type

ree
ree
ree
ree
ree
ree
ree
ree
ree
ree
ree

1.11        Specify Work Center Layout

ree
ree
ree

1.12        Define Work Center

ree
ree
ree

Conclusion


The above steps need to be followed for to create warehouse organizational structure data for complex Inbound Process with Process Oriented Storage Control.

 

 

Rajesh Sharma

SAP WM/EWM Functional Consultant


ree

1 Comment


CBKM BOCU
CBKM BOCU
Nov 11, 2024

EPS Machine EPS Cutting…

EPS Machine Eps Raw…

EPS Machine EPS Recycling…

EPS Machine EPS Mould;

EPS Machine EPS Block…

EPP Machine EPP Shape…

EPTU Machine ETPU Moulding…

EPS Machine Aging Silo…

EPTU Machine ETPU Moulding…

EPS Machine EPS and…

EPS Machine EPS and…

AEON MINING AEON MINING

AEON MINING AEON MINING

KSD Miner KSD Miner

KSD Miner KSD Miner

BCH Miner BCH Miner

BCH Miner BCH Miner

Like
bottom of page