Configuration Steps for LOSC in SAP EWM
- Rajesh Sharma
- Oct 19, 2024
- 2 min read
LOSC Master Data and Configuration steps in SAP EWM
In this blog, we are going to discuss LOSC Master Data and Configuration Steps in SAP Extended Warehouse Management
Â
Configuration Steps
1.     Define Warehouse Process Type
Step 1: Copy from WPT 1010
Warehouse Process Type (Internal) for Transfer
Define Control Indicator for Warehouse Process Type DeterminationÂ
Step 1: Create New Entries, Enter WPT determining Control Indicator, and description, and save
3.    Determine Warehouse Process TypeÂ
4.    Define Storage Type
Step 1: Copy from 1010
5.    Generate Activity area from Storage Type
Step 1: Enter Warehouse Number and Storage Type and Execute
6.    Create Bin
Step 1: Enter Storage Bin Name and Enter, Enter Storage Type, Save
7.    Layout-Oriented Storage ControlÂ
Step 1: Click on New Entries, Enter Warehouse Number, Source Storage Bin, Intermediate Storage Type, Intermediate Storage bin, and check ID point box
Master Data
Create Material Master
 Step 1: Enter Material, Material Type, Industry Type, select, views
Enter Plant Storage Location
Maintain Warehouse Product Master
Maintain Packaging Specification
Step 1: Click on Create button, enter Packaging Specification Group and, enter, select line item, click on view
Step 2: Enter Condition Type, Product, and Ship from
Step 3: Click on Product, and enter the Product detailed
Step 4: Enter Packaging Material, and click on HU Check button
Step 5: Click on Preview
Step 6: Click on Activate
Conclusion
The above Steps need to be followed to configure LOSC in SAP EWM.
Credit
Â
This blog writing inspiration is from Naidu Sir's Live EWM Training Recorded Videos at SASTRAGEEK.Â
Â
Â
Rajesh Sharma
SAP WM/EWM Functional Consultant
§ Linked in profile: https://www.linkedin.com/in/rajesh-sharma-204910278/
§ Twitter: RajeshS98151512/ RAJESH SHARMA@RAJESHS21287609
§ SAP Blogs: https://www.sastrageek.com/blog